The entire Accelerator and High Voltage structure was built onto a metal platform placed above the column and power supply's. This entire structure was in turn placed on the isolated Foundation of the Microscope, located a story lower. The entire machine occupies 4 to 5 stories of a building, owing to the need to move the tank cover, and the need to house the crane to do so.
 
The entire Accelerator and High Voltage structure was built onto a metal platform placed above the column and power supply's. This entire structure was in turn placed on the isolated Foundation of the Microscope, located a story lower. The entire machine occupies 4 to 5 stories of a building, owing to the need to move the tank cover, and the need to house the crane to do so.
 +
 +